Thursday, 4 April 2019

Views from above

We had a reporter and photographer come to make an article about our project. The photographer had a copter/drone that he took these winter pictures with.


A picture of our place from right above. The blue circle is our house (covered with a tarpaulin), next to it building wood under cover, to the left of it some trees, the outside toilet on the edge of the few trees, all the way to the left the piles of fire wood. Closest to the top of the picture a pile of building wood and close to that the play house. To the bottom of the photo there is the driveway up to our yard. To the right (south) of the house there will be our garden with berries. Picture/Kuva: Aleksi Jalava/Iltasanomat

 
Picture taken from the south so here you could see our well and garden if it wasn't covered with snow. To the right here is building wood under cover.  On the east side of the house you can see the completed tin roof. The rest of the roof is covered with a tarpaulin and the sides are covered with recycled plastic to keep the snow out of the house for the winter. To the east we have young spruce forest on a uphill, to the west we have really young mixed forest with mostly birch on a downhill. Picture/Kuva: Aleksi Jalava/Iltasanomat

 
 Picture taken from the north. In the background you can see my dads vegetable farm. When we are in our yard we are not able to see the fields through the skinny forest. Picture/Kuva: Aleksi Jalava/Iltasanomat 


This picture is taken last summer from the roof of our house. It shows the few trees we have between the house and the fire wood piles.


 This is taken towards north. Playhouse and in distance building wood.


And this is taken towards south. There is our water well surrounded by earth that our helpers moved to make the ground higher because the ground around the well was in a depression. So now the rain water does not run down hill straight to the well and will hopefully flow away because of the uphill it meets before the well. You can also see the area that will be our back garden.

Tuesday, 2 April 2019

How far we got on the roof in 2018

So we continued on working right up until Christmas again last year in an attempt to get the roof finished before the winter, but as you will see it did not quite get there. All of the major structural stuff is done but only one third of the roof is covered with used corrugated galvanized sheets. We chose to use the metal sheets as they have a lot less work involved than the aspen shingles we were planning on. 

 Scale model of roof

I changed the shape of the dormer windows to better suit the metal roofing sheets, thus avoiding lots of joints between different roof surfaces meeting. I made a scale model of the roof to try out some ideas and decided on this shape which divides the roof into three somewhat flat surfaces. All the cuts on the sheets are at about 45 degrees which reduces waste. So we end up with pointy topped dormers instead of the more curvy eyebrow shape .

Our minimalist scaffold with dormer roof windows to the sides

First we fixed the soffit boards to the overhanging part of the roof. These are 1 inch sawn boards with natural edges, we first scorched them with a propane blow torch to give some more resistance to insects and rot protection, and they look nice too. Then cut and nailed them all around the roof. They will only be seen from underneath.

Soffit boards with wind protection layer above

Next the dormer windows, fixed on to the wall beam a 5"X6" frame carries the central rafter which is the same design as all the other rafters. Then 4"X2" jack rafters run at right angles from the central rafter to meet the main roof surface. Then we built a small stud wall each side to make the space for the insulation and to give intermediate support to the jack rafters. The jack rafters we needed to fix temporarily because they had to be lifted for the wind protection membrane to run underneath, this was a bit awkward and slow, I would have liked to avoid this but could not come up with a better solution.

Dormer window from inside

Jack rafters

Then we get to start covering up! Wind protection membrane, 2"X2"s fixed horizontally at 800mm centers, 2"X2"s vertically along the run of the rafters, these make up the recommended 100mm ventilation space. Then water protection membrane, 2"X1"s vertically, 4"X1"s horizontally spaced to suit existing holes in second hand roof sheets, and finally cut and screw on the corrugated galvanized roof sheets. Yay!

 Membrane layers and ventilation space

Nearly ready for metal roof sheets

So we got one of the three main sections finished and the tarpaulins covered the rest of the roof. We put up a plastic wall to keep the snow out and then took a long rest!

House from the east

Sunday, 31 March 2019

THANK YOU!

Dear Helpers of year 2018  (and sorry this comes very late!)


Thank you soooo much for all your help you gave. It was great to have you all here and we got a lot done.Year 2018 we started and completed the timber structure for the house. We completed the structural part of the roof. That was great. We also made many years worth of firewood, started with the garden and made the water well usable by moving a lot of earth. Not to forget picking 100 liters of blueberries, 100 liters of lingon berries and all the other big and small jobs that came along. THANK YOU FOR ALL OF THAT! We would not be able to do this project without you all!
This year 2018 we had 16 helpers from Norway, Belgium, England, Germany, France, Japan, China and Reunion. You did all together 324 days of work (of which 120 was by our long term helper Karel, triple thank you for you!). What a great successful year!

The amount of snow on the fire wood piles. This picture was taken on the 29th of March 2019

Friday, 23 November 2018

Firewood project


From clearing the forest to become a road we had loads of wood that was too small for using for the building project so it was perfect for firewood. When we were clearing the road last year we cut the wood into the right length and piled beside the road in the forest. One of our projects this summer has been to collect the piles of wood (with a tractor and trailer) to the building site, splitting the fat ones thinner (with a splitter attached to the tractor) and then piling them above the ground to dry properly and finally we covered them with tin.


This is a job we have done the whole summer whenever we had the chance. It has taken a long time and about 10 different helpers and us have done it along the summer. Thank you every one!


For us the most ecological and economical option is to heat with wood so we will have an wood burning oven in the middle of the house. The plan is that this oven will heat the whole house. One can be quite self sufficient for firewood with 5 hectares of land since there is always trees that fall down in the wind or ones that can be thinned out. We also can use my dads fallen trees or thin his forest out from the parts that are close to our land. That we also did last winter cause we weren't sure do we have enough firewood. But now that we have it all splitted and piled we see we have loads! This will be enough for 3-5 years. To get the most heat energy out of firewood the best is to dry it for two to three years so that is why we are doing this all now, before we even have an oven to put it in. 

Sunday, 11 November 2018

Building the Conical Roof

 Time to put the roof on our 9 sided structural frame


New tarpaulin position

Originally the load bearing structure of the roof was to be 9 big beams running from the post and beam joints to the centre, where they would be supported on a triangle of centre posts. Our engineer worked out the loads on the roof and because of the long overhang the loads either side of the walls were equal, this made the centre posts unnecessary.
 I was not totally sure about how to build the roof now but thought we will figure it out when the time comes.
 The time eventually came and I was none the wiser, we had a visit from our builder friend Ossi who suggested doing without the 9 big roof beams and making 36 roof "elements", a sort of home made roof truss consisting of a double rafter joined with pieces of plywood. So the roof had a change of design which sorted out allot of technical questions.

Karel making the housing joint for one of the last few rafters

The rafter truss elements are made of a 4.2m sawn pine 5"x2", a 7.2m long 120mm min. diameter (at the wall loading point) roundwood spruce log and four 350mm wide 12mm salvaged plywood pieces fixed at 1.2m centers with 3"nails.
The roundwood elements we cut slots in or made flat surfaces with the chainsaw so the plywood could be fixed to them.

Roundwood rafter with slot and flattened surfaces

Rafter truss fixed in position
 At the centre of the house space needs to be left for the chimney so the rafters are fixed to a ring which we made by glueing and screwing 3 layers of 4"x2"s.

Centre ring

We wanted the roof to look round which means the rafters need to be in different positions on the supporting beam.

Rafter position at post and beam joint

Rafter position at halfway between posts

Checking intermediate rafler housing joint

 We fixed some temporary diagonal braces to stop the whole thing going into a downward spiral!

Lots of wood!

  Now we are working on the 3 dormer roof windows, after them the roof can be sealed up for the fast approaching winter.

Tuesday, 2 October 2018

Wind braces


After fitting the post and beams the wind braces need to be done. These stabilize the building providing racking strength, when the wind blows on one side of the house it will try to push over the building, the braces help to stop this. They are fitted at 45 degrees using traditional mortise and tenon joints which are then drilled and pegged. The beams we removed and put on the bench to make the mortises.

Mortise marking template






















The mortise marking template is offered up to the flat surfaces which have been left on the post and beam. It is adjusted to suit the length, clamped and then the 2"x4" mortise positions are marked.

Mortise in post

We had to adjust the heights of the mortises as they were meeting in the posts, amateur mistake! And next time I'm working with round wood put centre lines on everything and work to these for all setting out and positioning. I placed the post and beams lining up on the outside edge, this caused a fair bit of difficulty for everything I had to do with them afterwards.

Magic box for marking and cutting the braces

Our magic box is then adjusted to the same length as the mortise template and the brace is placed in the center and fixed in position with loads of big screws. There are marks showing the tenon positions. A hand saw is used to make the cuts with the blade snug against the 45 degree ends. Ben Law's Roundwood Timber Framing book explains all this a bit better. Thats where I got this idea from and it worked out really well, these templates were definitely worth making for making braces with roundwood.


Karel checking the tenon surface for flat



Beam and wind braces ready for fitting


Ben lifting the heavy beam onto the scaffold solo!



Lining up brace tenons with beam mortices



A little encouragement and then its done
Next the joints are drilled and pegged with a 7/8" 22mm pegs made from dried spruce branch.


Wednesday, 25 July 2018

A new building to our site

The 21st of June we got a new building on our site, just like that! My dad has build a playhouse for the kids to play in. He built it on his field with Leo`s help. Leo did the hammering of the whole floor and he was happy to help. And quite accurate with his hammering!

To get the playhouse to our site we drove one tractor to the back of it to stop it from falling over and drove the other tractor in front of it with. 

Then bit by bit we lifted it higher until we got the boards from under the house on to the trailer. Then the trailer was tipped and the house was pushed on the trailer. There was nine of us doing it.

Then it was driven to the site and put on six rocks. Later it got a roof on it.