It all started on the 5th of November 2016. That's when
we decided to build. We wanted to buy land from near my dad's organic
vegetable farm. It took some weeks contacting the land owner to ask will
he sell and waiting for an answer. Those weeks felt long and we were
making plan B and plan C in case the land wouldn't be sold. But the owner
did decide to sell and we were delighted! We bought the land
on the 14th of December 2016. At the same time also my dad bought land
surrounding his fields and our plot. That makes it easier for us
because now we can make the road through his land.
In the end of
December we started clearing
trees to make the road that
will lead to our home. The road will be off the road that leads to my dads farm and it will be about 750 meters long. It has to be cleared a shocking 12 meters wide for the digger to be able to work. The clearing we do happens with a motor saw, a billhook and and
ax. We have recently found a good pattern to go about it. I chop with
the billhook low branches off the trees so that it is easier for Mick to
come along and saw the trees down. When he has sawed a good amount of
trees down we chop the rest of the branches off all along the tree. The
trees that we will use for the building we carry in a pile for peeling.
Until now we are saving all the suitable size spruce trees for building.
Spruce is what we will mainly be getting off this road and it's a
strong tree type to
be using. The rest so birch, aspen and alder Mick cuts up into suitable
length's for firewood and we pile them up as well to be taken away
later.
Hi guys. Good luck with the build. Will be following with great interest.
ReplyDeleteCongratulations on the great beginning of an exciting project! All the best!
ReplyDeleteWow, very interesting! Good luck with the building project and greetings from an old neighbour from childhood ;)! Laura Heinonen (former Huikuri)
ReplyDelete