Not achieving goal number two

Yes, our second goal to have the building planning application ready before we leave wont happen. We wanted to have it so that we leave the application before we go on our trip and while we are gone it would be looked at in the planning office and then when we would come back we would have the permission to build (or just small alternations needed).

But this was too much to achieve in the time we had. We got close but not ready. Mick drew all the sketches for the house and we gave them to our construction designer. He drew them almost ready on the computer but gave us some good suggestions to change the floor plan. So we started rethinking the layout and thats what we are still doing. With a small house it is crucial to have everything planned right. And planning takes time.

Well, our new goal is to decide what we want and then have that drawn up by our designer. When we come back we will do the rest that needs to be done for applying and then we will apply as soon as possible. This new timetable will delay our plans but we hope not too much. And at least we will have a better floor plan in the end!

No comments:

Post a Comment